First page Back Continue Last page Graphics
Now fully suspended, the bridge swings into position as Monica and Linda operate the rope puller from the side. Meanwhile James is working the high line winch to raise the section high enough to get over the blocks on the side of the pier. It was quite a sight, having the bridge section just “floating” over the piers as we worked it into position. (photo by Bill Taggart)